Installation & Removal
![]() |
| Load testing of a Kenz crane (right) newly installed on Talisman's 'Claymore' platform with the assistance of temporary cranage supplied by Sparrows Offshore (left) |
The engineering design work determining the specification and location of the crane - and the specification of its supporting structures - is extensive.
![]() |
| Build-up of a new crane installed on the Buchan A platform. |
Energy Cranes engineering teams have 30 years experience not only in specifying and installing original cranage, but also in planning replacement cranes where damage or extended field life make this necessary.
Ultimately, when installations are to be decommissioned, Energy Cranes have proven expertise in the planned removal and refurbishment of cranes - and a network of world-wide client links to help clients realise asset value on these reconditioned cranes.







